IRIB News
🔺️Iran's first geothermal power plant has been connected to the national power grid. Minister of Energy: 🔹️The geothermal power plant in Meshginshahr, Ardabil, with a capacity of 5 megawatts and an investment of 10 million euros, has been connected to the national power grid and has entered the electricity production cycle. 🔹️This project is being completed as a pilot on a reservoir of geothermal energy with a production capacity of about 250 megawatts.
Open permanent article page